PABCO GYPSUM
(NEWARK, CA) Blue Star Steel provided new surge and rock bins for a Phase II expansion, including 400 tons of supporting structural steel and adjacent platforms. |
PIEDMONT NATURAL GAS
(MAXTON, NC) In coordination with Matrix Service, Blue Star Steel supplied more than 100,000 pounds of structural steel, grating, and handrail for a tank structure. The project includes a 350-ft above-ground platform, more than 1,000 linear feet of handrail, 4,000 sq. feet of grating, and 300 linear feet of ladders to help support daily operations of the facility. The project provides over 1 billion cubic-foot natural gas (LNG) storage to the southeastern United States. The LNG facility is scheduled to be fully operational mid-2021. |
BIG WEST OIL
(NORTH SALT LAKE, UT) Blue Star Steel supplied several hundred feet of industrial pipe rack support and down piping for Big West Oils ISBL and OSBL West Flare recovery project. It also included three knock-out-drum vessels ranging in sizes from 120” diameter x 38’ long , 72” diameter x 17’ tall, and 16” diameter x 4’ long. |
NEVADA GOLD TURQUOISE RIDGE
(GOLCONDA, NV) Since 2018 Blue Star Steel has supplied nearly 2-million pounds of structural steel and chutes for Thyssen Mining at Nevada Gold Turquoise Ridge. Steel fabrication includes 140’ production shaft headframe, a collar house, bin house, and electrical enclosures for mining operations. Additionally, Blue Star is supplying more than 40,000 linear feet of fabricated HSS tube sections for the mine shaft that will reach 3200 ft. below ground. Estimated completion is Summer 2021. |